UK Power Connections excavation for a new LV connection, Richings Way, Iver
NERS Accredited ICP

NERS-Accredited Power Connections for Housing, Commercial & Industrial Sites.

UK Power Connections Ltd is a NERS-accredited Independent Connection Provider based in St Albans, Hertfordshire. We design and build new electricity connections, ready for adoption by the DNO or IDNO.

Design Delivery Approvals Adoption-ready NERS Full Accreditation Independent Connection Provider (ICP)
NERS
Accredited (LRQA)
LV & 11kV
Construction scopes
10+ yrs
Founder experience

Complete Utility
Connections

We manage every aspect of your connection, from designing custom network solutions to conducting complex civil and electrical works.

01
Independent Connection Provider (ICP)

NERS-accredited to design and build electrical infrastructure for new or modified connections, ready for adoption by the DNO or IDNO.

02
Contestable Works

Cable laying, jointing, civil works, duct installation and substation installation for adoptable infrastructure — delivered to DNO adoption standards.

03
ICP / IDNO Coordination

Full management of the connection process, acting as an intermediary between your project and the DNO — handling all technical and commercial interfaces.

04
Project Management

Dedicated personal service with a single point of contact to speed up delivery, resolve technical issues and keep your programme on track.

Completed EV chargepoints at Challenge House
EV Projects & Installs

End-to-end EV charging infrastructure for local authorities and commercial sites. NERS-accredited and designed around your charging load.

View EV Projects

New supply or upgrade?
We’ll handle the application.

We prepare and submit your connection application to the DNO, whether it’s a brand-new supply or an increase to an existing one. You get a response from the network operator typically within 4 weeks, with no chasing on your part.

Why use an ICP
FasterWe deliver the contestable works ourselves.
Cost-effectiveValue-engineered designs, shorter programmes.
Managed end to endDesign through to DNO coordination.
UK Power Connections operative on site at Iver, Fern Media

Experience You
Can Trust

Led by Ryan Brady, Founder & Director, who brings more than a decade of hands-on experience in the UK power sector.

Across his career Ryan has been involved in 500+ connections, from residential phased energisation to major industrial upgrades. He founded UK Power Connections Ltd (Company No. 15728874), a NERS-accredited ICP based in St Albans, in 2024 to bring that experience to developers directly.

"Our mission is to simplify the connection process through direct accountability and technical excellence."
Ryan Brady
Founder & Director
10+
Years Exp
NERS
Accredited
500+
Connections

Recent On-Site Delivery

A look at our technical standards across infrastructure, electrical jointing and civil engineering.

On site · October 2026
New LV supply works, Iver
Trench with depth staff, Iver
Civil Engineering
Trench with depth staff, Iver
Barriered cable route along the lane, Iver
Civil Engineering
Barriered cable route along the lane, Iver
Excavation for new LV supply, Iver
Civil Engineering
Excavation for new LV supply, Iver
Trench works, Richings Way, Iver
Civil Engineering
Trench works, Richings Way, Iver
Cable trench preparation, Iver
Civil Engineering
Cable trench preparation, Iver
Site equipment and plant, Iver
Infrastructure
Site equipment and plant, Iver
Live street works, Iver
Civil Engineering
Live street works, Iver
Traffic management and signage, Iver
Civil Engineering
Traffic management and signage, Iver
Street works barriers, Iver
Civil Engineering
Street works barriers, Iver
New connection route, Iver
Infrastructure
New connection route, Iver
New-build site, Iver
Civil Engineering
New-build site, Iver
Excavator operator on site, Iver
Civil Engineering
Excavator operator on site, Iver
Hand-digging the cable route, Iver
Civil Engineering
Hand-digging the cable route, Iver
Plant and crew in the works area, Iver
Civil Engineering
Plant and crew in the works area, Iver

11kV Substation
Scheme

A complete high-voltage scheme delivered by our own team: 11kV cable delivery and lay, footway excavation under pedestrian management, ducting into the substation, transformer and LV board installation, and the 11kV terminations.

New substation with transformer, LV board and 11kV cables in place
11kV cable laySubstation installationHV terminationsStreet works
11kV cable delivery, 11kV substation scheme
11kV cable delivery
Footway works under pedestrian management, 11kV substation scheme
Footway works under pedestrian management
Cable winch at the excavation, 11kV substation scheme
Cable winch at the excavation
11kV cables laid in the trench, 11kV substation scheme
11kV cables laid in the trench
Ducts and cable entry to the substation, 11kV substation scheme
Ducts and cable entry to the substation
HV terminations in progress, 11kV substation scheme
HV terminations in progress
Completed 11kV terminations, 11kV substation scheme
Completed 11kV terminations

Specialised EV Charging Infrastructure

Working with local authorities on large-scale EV rollouts? Visit our dedicated EV Projects page for end-to-end charging infrastructure delivery.

View EV Projects
LRQA NERS accredited · Cert. PRJ11100515605F · valid to March 2028
LV & 11kV cable laying, jointing and substation installation
Verify on the NERS register

St Albans based, delivering UK-wide with UK Power Networks, SSEN, NGED and IDNOs including MUA, Aurora, Energy Assets and Eclipse Power.

FAQ

Common questions

What is an ICP?

An Independent Connection Provider is an accredited company that designs and builds new electricity connections. Once complete, the network is adopted by the DNO or an IDNO.

Does an ICP adopt the network?

No. Only a DNO or IDNO adopts. UK Power Connections builds the assets to their specification, ready for adoption.

What are contestable and non-contestable works?

Contestable works include cable laying, jointing, civils and substation installation. Non-contestable works are the elements on the existing network, such as the final connection. UK Power Connections delivers both, start to finish, with the DNO’s approval.

How long does a new connection take?

It depends on the size of the connection, permits and DNO programmes. Involving an ICP early is the best way to avoid delays.

Is UK Power Connections accredited?

Yes. UK Power Connections Ltd holds LRQA NERS accreditation, with construction scopes including LV and 11kV cable laying, jointing and substation installation.

Contact Us

Timely Connections
with Confidence

Acting as your intermediary between the DNO and your project to ensure a smooth, cost-effective power supply.

📞
Phone Support
01727 229040
💬
WhatsApp
07379 389972
📍
Office
Arquen House, 4-6 Spicer Street, St Albans, Hertfordshire, AL3 4PQ